Beer Transfer Changes Before LA House Committee

Share Post

Pending in committee, House Bill 821 would remove the requirement that a transferring brewing facility that maintains no less than a 10-barrel brewing system, and the receiving brewing facility owned wholly by the transferring brewing facility maintains no less than a five-barrel brewing system. Removes the requirement that the quantity of beer transferred does not exceed an amount greater than 50% of the receiving brewing facility’s production of beer for the previous month.

Was this article helpful?
YesNo

Links: